Chief Architect Help Database - Article Number: 1245
How to Modify Automatic Deck Framing
The information in this article applies to:- Chief Architect X5
- Chief Architect X4
- Chief Architect X3
I need to modify the automatic deck framing that Chief Architect created automatically in my plan. What are my options?
Chief Architect's Automatic Deck Framing is a fast way to generate your decks' posts, beams, joists and planking. You can then modify any of these framing members as needed.
In this example, the automatic deck framing interferes with the view from a walkout basement in a simple rectangular plan, so we will modify the posts and beams to better suit the house plan.
Note: Chief Architect is not an engineering program and will not calculate loads or other important structural considerations. Always have your designs approved by a licensed engineer before building.
To create the basic plan
- Select File> New Plan
to open a new, blank plan.
- Select Build> Wall> Straight Exterior Wall
and draw four walls to enclose a rectangular room. In this example, the structure measure 30' x 45'.
- Select Terrain> Create Terrain Perimeter
to create terrain.
- Select Build> Foundation> Build Foundation
from the menu.
- For a walkout basement, choose Walls with Footings as the Foundation Type and specify a wall height sufficient for a full height basement.
- In this example, a Min Wall Height of 101 1/2" is used.
- For a walkout basement, choose Walls with Footings as the Foundation Type and specify a wall height sufficient for a full height basement.
For more information about creating a walkout basement in sloping terrain, see Article #376: How to create a walk-out basement.
To use automatic deck framing
By default, the program will generate Automatic Deck Framing whenever a new Deck room is created - or modified. Once the Deck room is defined and the framing built, the room's Automatic Deck Framing needs to be turned off so that it can be modified without being rebuilt.
- Go Up One Floor
to Floor 1, select Build> Deck> Straight Deck Railing
and draw railings to enclose one or more Deck rooms attached to the main house. In this example, three Deck rooms are drawn.
Note: If a Deck is drawn on Floor 1 and a foundation is present, the deck framing will be drawn on Floor 0. If no Floor 0 is present, the deck framing will be created on Floor 1. - Click the Select Objects
button, then click in an empty space in the Deck room to that spans the right side of the back of the structure to select it.
- Click the Open Object
edit button to open the Room Specification dialog.
- On the Deck tab, uncheck Automatic Deck Framing and click OK.
To replace a beam
- Go Down One Floor
to Floor 0.
- In order to edit deck framing, we must be able to see it. Use the Active Layer Set Control drop-down to switch to the Framing Set.
- Click the Select Objects
button, then click on the beam that runs under the Deck room that has Automatic Deck Framing turned off.
- This beam is placed under the deck joists and will interfere with the walkout basement. With the beam selected, click the Delete
button or press the Delete key on your keyboard.
- We can now modify the deck's rim joist to replace the deleted beam. Select this framing member and click the Open Object
edit button.
- On the General tab of the Framing Specification dialog:
- Change the Depth to 15 1/2".
- Change the Thickness to 5 1/2".
- Change the Type to "Glulam".
- Click OK to close the dialog and apply your changes.
- The new beam is resized concentrically from the centerline outward, so it will have to be moved to compensate for this change.
- Change the Depth to 15 1/2".
- To do this, click the Transform/Replicate Object
edit button while the beam is still selected. In the Transform/Replicate Object dialog:
- Check the box beside Move.
- In the Y Delta text field, type -2".
- Click OK to close the dialog and move the beam.
- Check the box beside Move.
To edit posts and footings
Some of the posts and footings block the view from the walk-out basement windows. The problem posts can be removed and those remaining can be moved and resized to bear the load above.
- Click the Select Objects
button, then click on one of the posts to select it.
- Hold down the Shift key on your keyboard and click on another post to add it to the selection set.
- Continue holding down the Shift key and selecting as many additional posts as you wish.
- Hold down the Shift key on your keyboard and click on another post to add it to the selection set.
- With the posts selected as a group, click the Delete
edit button.
- Shift-select the remaining posts under the new beam and click the Open Object
edit button.
- On the General tab of the Post Specification dialog:
- Lock the Bottom Height.
- Specify the Top Height as -14 5/8", which in this example is the Bottom Height of the beam noted above.
- Specify both of the Post Width values as 5 1/2".
- Click OK to close the dialog and apply your changes.
- Lock the Bottom Height.
- Center each of the resized posts on their footings. To do this:
- Select Edit> Snap Settings from the menu and make sure that Object Snaps
- particularly Center Snaps
and Midpoint Snaps
- are enabled.
- Click on a post to select it and then click the Point to Point Move
edit button.
- Move your mouse pointer over the post's center point and look for the Center
snap indicator. When you see it, click once.
- If you do not see this snap indicator, you may need to Zoom
in and try again.
- Next, move your mouse pointer over the footing's center point and look for the Midpoint
snap indicator. When you see it, click once more to adjust the post's position.
- Repeat this process to center all resized posts on their footings.
- Select Edit> Snap Settings from the menu and make sure that Object Snaps
- The resized posts and their footings now need to be moved so they are positioned under the Glulam beam. The Transform/Replicate Object edit tool can be used for this purpose:
- Select Build> Framing> Post
from the menu and then hold down the Shift key on your keyboard and draw a rectangular selection marquee around the resized posts.
- With the posts selected, click the Transform/Replicate Object
edit button.
- In the Transform/Replicate Object dialog, check the box beside Move. In this example, a Y Delta value of 13 1/4" is used. Enter the desired value and click OK to close the dialog and move the selected objects.
- Select Build> Slab> Slab
from the menu, draw a marquee around the resized slabs' footings and move these items in the same way.
- Select Build> Framing> Post
To trim the joists' length
Instead of bear on the original beam, the joists will now attach to the edited rim joist using joist hangers. At this point, they are still sized to meet the rim joist before it was resized and need to be shortened.
- Select the Glulam beam and click the Trim Object(s)
edit button.
- Click and drag a temporary line, or fence, that runs through the joists where they extend into the beam.
- When you release the mouse button, the ends of the joists will be trimmed back to the inside edge of the beam.
- When you are finished, you can create Perspective Full Camera
view to see the results.
Last updated on: Mar 29, 2013